same man as above this was a real busy day, I the wintertime obviously chapper arrived at 9 and by 5.30 and dark that day we had chapped 30 strainers, and 650 posts.
another scheme fence this one was the only length requiring rabbit net along with 7 lines it was a real pest to put up I attached the net before the barbed and what a job I had pulling the wires tight what with them catching in the net